Dietmar Feichtinger Architects

Dietmar Feichtinger Architectes

Opening of the footbrige ‘Passerelle de la Paix’
Lyon
17 03 2014
France

Gerard Collomb, President of the Grand Lyon and Dietmar Feichtinger, as well as 200 kids from schools on the both sides of the river opened the footbridge on Monday. With a clear span of 157 m and an overall length of 220 m the bridge spans over the Rhone to link the conference center ‘Cité Internationale’ and the area St. Clair.

Engineers, Schlaich Bergermann and Partner

Related Content

Event

Trophee Eiffel, Dietmar Feichtinger appointed as president of the jury

Paris
31 05 2025
France
Project

Night Closures on A1 and A3 for Installation of Line 17 Viaduct – Grand Paris Express

Paris
20 05 2025
France
Project

Anselm Kiefer and Dietmar Feichtinger Collaborate at Versailles Chantiers Station – Line 18, Grand Paris Express

Paris
14 05 2025
France
Event

Bap! Biennale d’Architecture et de Paysage

Versailles
7 05 2025
France