Gerard Collomb, President of the Grand Lyon and Dietmar Feichtinger, as well as 200 kids from schools on the both sides of the river opened the footbridge on Monday. With a clear span of 157 m and an overall length of 220 m the bridge spans over the Rhone to link the conference center ‘Cité Internationale’ and the area St. Clair.
Engineers, Schlaich Bergermann and Partner