The reconstruction of the former industrial area of the Oude Dokken is based on a masterplan of OMA. Dietmar Feichtinger Architectes wins the 3 footbridges with the length of 30|110|110 m over the former docks.
Related Content
Event
Dietmar Feichtinger Honored by the Académie d’Architecture
Paris
7 01 2026
France
Project
A Significant River-Based Operation
Mantes-la-Jolie
19 11 2025
France
Project
The Voyage of the Anne-de-Bretagne Bridge: A Floating Giant for a Sustainable City