Dietmar Feichtinger Architects

Dietmar Feichtinger Architectes

Inauguration of the aquatic centre Kibitzenau
Strasbourg
7 07 2014
France

The aquatic centre Kibitzenau in Strasburg is officially inaugurated this Monday July 7th by the Major. The pools open for public on Saturday July 12th.

Related Content

Project

The Voyage of the Anne-de-Bretagne Bridge: A Floating Giant for a Sustainable City

Nantes
20 10 2025
France
Event

Dietmar Feichtinger, Architekt, 27.7. | Radio Ö1

Wien
27 07 2025
Austria
Event

Trophee Eiffel, Dietmar Feichtinger appointed as president of the jury

Paris
31 05 2025
France
Project

Night Closures on A1 and A3 for Installation of Line 17 Viaduct – Grand Paris Express

Paris
20 05 2025
France